Certificate III in Civil Construction
This qualification has been superseded by RII30926 Certificate III in Civil Construction.
This qualification covers skilled work in civil construction, such as building roads, bridges and tunnels, laying pipes, road marking and traffic management. It includes reading plans, doing measurements, using tools and small plant, and working safely. People already working in civil construction may be able to have their experience recognised through RPL.
- TRAINING PACKAGE
- RII Resources and Infrastructure Industry
- ENTRY REQUIREMENTS
- Nil
- SUPERSEDES
- RII30919 Certificate III in Civil Construction (equivalent)
WHO IT'S FOR
People who work as skilled operators on roads, bridges, pipelines or other civil sites and want a formal qualification.
TYPICAL JOB ROLES
- Civil construction worker
- Road builder
- Pipe layer
- Bridge construction worker
- Road marker
- Traffic controller
Qualification structure
25 units in total. The following provides the packaging rules for this qualification, followed by the list of relevant units of competency. The qualification has core and elective units of competency that cover the skills for the following eight (8) specialist and one (1) general civil construction specialisations: Specialisation 1 – Bituminous Surfacing Specialisation 2 – Bridge Construction and Maintenance Specialisation 3 – Pipe Laying Specialisation 4 – Road Construction and Maintenance Specialisation 5 – Road Marking Specialisation 6 – Tunnel Construction Specialisation 7 – Timber Bridge Construction and Maintenance Specialisation 8 – Traffic Management Specialisation 9 – Civil Construction General The core and elective unit requirements of one (1) specialisation must be met for this qualification to be awarded. All elective units selected for this qualification must reflect current occupational and learning outcomes of this AQF qualification level. The elective bank contains both licensed and non-licensed units of competency relating to high risk work in the resources and infrastructure industry. To be appointed under any statutory requirements in related roles, units of competency should be selected to meet the state/territory licensing requirements. There are prerequisites to imported units listed in this qualification. Where a unit is imported as an elective care must be taken to ensure that all prerequisites specified are complied with. To be awarded the Certificate III in Civil Construction (Bituminous Surfacing) the following packaging rules apply: At least four (4) must be chosen from the electives in Group A and/or Group B. Up to nine (9) may be chosen from the electives in Group C. Up to four (4) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. To be awarded the Certificate III in Civil Construction (Bridge Construction and Maintenance) the following packaging rules apply: Eight (8) must be chosen from Group D. At least two (2) must be chosen from Group E. At least three (3) must be chosen from Group F. Up to four (4) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. To be awarded the Certificate III in Civil Construction (Pipe Laying) the following packaging rules apply: Ten (10) must be chosen from Group G. At least one (1) must be chosen from Group H. At least three (3) must be chosen from Group I. Up to three (3) may be chosen from the electives below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. To be awarded the Certificate III in Civil Construction (Road Construction and Maintenance) the following packaging rules apply: Nine (9) must be chosen from Group J. At least two (2) must be chosen from Group K. At least two (2) must be chosen from Group L. Up to four (4) may be chosen from the electives below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. At least five (5) of the eighteen (18) elective units chosen must be road construction and maintenance (RIICRC) units. To be awarded the Certificate III in Civil Construction (Road Marking) the following packaging rules apply: Four (4) must be chosen from Group M. At least one (1) must be chosen from Group N. At least six (6) must be chosen from Group O. Up to three (3) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. At least seven (7) of the fifteen (15) elective units chosen must be road marking (RIICRM) units. To be awarded the Certificate III in Civil Construction (Tunnel Construction) the following packaging rules apply: At least five (5) must be chosen from Group P. At least six (6) must be chosen from Group Q. At least two (2) must be chosen from Group R. Up to four (4) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. At least two (2) of the eighteen (18) elective units chosen must be tunnel construction (RIICTC) units. To be awarded the Certificate III in Civil Construction (Timber Bridge Construction and Maintenance) the following packaging rules apply: Twelve (12) must be chosen from Group S. At least two (2) must be chosen from Group T. At least two (2) must be chosen from Group U. Up to four (4) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. To be awarded the Certificate III in Civil Construction (Traffic Management) the following packaging rules apply: Eight (8) must be chosen from Group V. At least four (4) must be chosen from Group W. At least three (3) must be chosen from Group X. Up to two (2) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. To be awarded the Certificate III in Civil Construction (General) the following packaging rules apply: At least four (4) must be chosen from one of Groups YA-YK. At least ten (10) must be chosen from Group Z. Up to three (3) may be chosen from the electives listed below, elsewhere within this training package, or from another endorsed training package, or from an accredited course. At least five (5) of the seventeen (17) elective units chosen must have a numerical code beginning with 3.
SPECIALISATIONS
- Bituminous Surfacing
- Bridge Construction and Maintenance
- Pipe Laying
- Road Construction and Maintenance
- Road Marking
- Tunnel Construction
- Timber Bridge Construction and Maintenance
- Traffic Management
- Civil Construction General
Core units
8 units- RIIBEF201EPlan and organise work
- RIICCM201ECarry out measurements and calculations
- RIICCM203ERead and interpret plans and job specifications
- RIICOM201ECommunicate in the workplace
- RIIRIS301EApply risk management processes
- RIISAM203EUse hand and power tools
- RIISAM204EOperate small plant and equipment
- RIIWHS201EWork safely and follow WHS policies and procedures
Elective units
504 unitsGroup A Asphalt Surfacing
- RIICBS202EHand spread asphalt
- RIICBS301EConduct profile planer operations
- RIICBS302EConduct paver screeding operations
- RIICBS303EConduct materials transfer vehicle operations
- RIICBS304ECompact asphalt with rollers
- RIICBS305EConduct asphalt paver operation
- RIICBS311EProduce asphalt products
- RIICBS313Conduct tack coat spraying operations
- RIICCM207ESpread and compact materials manually
Group B Spray Sealing
- RIICBS306EConduct micro surfacing operations
- RIICBS307EConduct bitumen sprayer operations
- RIICBS308ELoad aggregate using purpose built loaders
- RIICBS309EConduct self-propelled aggregate spreader operations
- RIICBS312EConduct bitumen tanker operations
- RIICBS314Conduct aggregate spreader box operations
- RIICBS315Roll aggregate in sprayed sealing operations
- RIICBS402ESupervise the application of bituminous sprayed treatments
Group C Bituminous Surfacing (General)
- BSBOPS304Deliver and monitor a service to customers
- BSBOPS402Coordinate business operational plans
- BSBTWK301Use inclusive work practices
- BSBXTW301Work in a team
- RIICBS203ESafely handle bituminous materials
- RIICBS207ETake samples of road surfacing materials
- RIICBS310EConduct patching operations
- RIICBS316Conduct pavement sweeping operations
- RIICBS317Conduct road maintenance operations
- RIICCM205FCarry out manual excavation
- RIIIMG301EMaintain site records
- RIIRIS202ERespond to site based spills
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
- RIIVEH304EConduct tip truck operations
- RIIWHS302EImplement traffic management plans
Group D Bridge Construction and Maintenance (Specialisation Core)
- RIICCM202EIdentify, locate and protect underground services
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM207ESpread and compact materials manually
- RIICCM208ECarry out basic levelling
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
- RIIWHS204EWork safely at heights
- RIIWMG203EDrain and dewater civil construction sites
Group E Bridge Construction and Maintenance (Technical)
- RIICBM301EMaintain concrete bridges
- RIICBM302E (has a prerequisite)Install pre-cast girders
- RIICBM303EInstall pre-cast parapets
- RIICBM304EOperate bridge inspection units
- RIICBM305E (has a prerequisite)Install pre-cast concrete bridge decks
- RIICBM306EUndertake concreting work on concrete bridges
- RIICBM307EConstruct formwork and false work on concrete bridges
Group F Bridge Construction and Maintenance (General)
- BSBTWK301Use inclusive work practices
- CPCCCM2007 (has a prerequisite)Use explosive power tools
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- CPCCLSF2001ALicence to erect, alter and dismantle scaffolding basic level
- CPCCSF2004 (has a prerequisite)Place and fix reinforcement materials
- CPCCWHS2001Apply WHS requirements, policies and procedures in the construction industry
- RIICBM201EStrip pile heads
- RIICCM209ECarry out concrete work
- RIICCM210EInstall trench support
- RIICCM211EConstruct and dismantle fences and gates
- RIICRC201ERepair potholes
- RIICRC208ELay pipes
- RIIHAN208EPerform dogging
- RIIHAN211DConduct basic scaffolding operations
- RIIHAN301EOperate elevating work platform
- RIIHAN302DConduct intermediate scaffolding operations
- RIIIMG301EMaintain site records
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIISAM205ECut, weld and bend materials
- RIIWHS202EEnter and work in confined spaces
- RIIWHS205EControl traffic with stop-slow bat
- RIIWHS302EImplement traffic management plans
- RIIWMG301EControl construction site water tables
- TLILIC0003Licence to operate a forklift truck
Group G Pipe Laying (Specialisation Core)
- RIICCM202EIdentify, locate and protect underground services
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM207ESpread and compact materials manually
- RIICCM208ECarry out basic levelling
- RIICCM210EInstall trench support
- RIICRC208ELay pipes
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
- RIIWHS302EImplement traffic management plans
- RIIWMG203EDrain and dewater civil construction sites
Group H Pipe Laying (Technical)
- RIICPL301EInstall water mains pipelines
- RIICPL302EInstall stormwater systems
- RIICPL303EInstall sewer pipelines
Group I Pipe Laying (General)
- BSBTWK301Use inclusive work practices
- CPCCCM2007 (has a prerequisite)Use explosive power tools
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- PMBWELD302Electrofusion weld polyethylene pipelines
- RIICCM209ECarry out concrete work
- RIICCM211EConstruct and dismantle fences and gates
- RIICPL304EInstall pre-cast gully pits
- RIICPL305EInstall pre-cast access chambers
- RIICRC201ERepair potholes
- RIICRC203EInstall sub-soil drainage
- RIICRC209ELay reinforced concrete box culverts
- RIICRC301EMaintain drainage systems
- RIIHAN208EPerform dogging
- RIIHAN211DConduct basic scaffolding operations
- RIIHAN301EOperate elevating work platform
- RIIIMG301EMaintain site records
- RIIMPO327EConduct pipe layer operations
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIISAM205ECut, weld and bend materials
- RIIWHS202EEnter and work in confined spaces
- RIIWHS204EWork safely at heights
- RIIWHS205EControl traffic with stop-slow bat
- RIIWMG301EControl construction site water tables
Group J Road Construction and Maintenance (Specialisation Core)
- RIICCM202EIdentify, locate and protect underground services
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM207ESpread and compact materials manually
- RIICCM208ECarry out basic levelling
- RIICRC201ERepair potholes
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
- RIIWHS302EImplement traffic management plans
- RIIWMG203EDrain and dewater civil construction sites
Group K Road Construction and Maintenance (Technical)
- RIICRC301EMaintain drainage systems
- RIICRC302EPlace and form concrete kerb, channel and fixtures
- RIICRC303ELay pavers
- RIICRC304EMaintain sealed roads
- RIICRC305EConduct road construction paver screeding operations
- RIICRC306EConduct earthworks
- RIICRC307EConduct road pavement construction
- RIICRC309EConduct stabiliser operations
- RIICRC311EConduct concrete road paver operations
- RIICRC312ESet up and maintain concrete paver stringlines
- RIICRC313EConduct concrete road curing and texturing operations
- RIICRC314EHandle concrete materials
- RIICRC315EUse concreting materials and equipment
- RIICRC316EPlace and compact concrete
- RIICRC317EFinish concrete pavements
- RIICRC318ECure concrete
- RIICRC319ESaw and cut concrete pavements to initiate planned cracks
- RIICRC320ESeal concrete pavements
- RIICRC321EUse automated paving guidance systems
- RIICRC322EReceive, check and record concrete deliveries
- RIICRC323EInsert tie bars in fresh concrete
Group L Road Construction and Maintenance (General)
- BSBTWK301Use inclusive work practices
- CPCCCM2007 (has a prerequisite)Use explosive power tools
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- CPCCLSF2001ALicence to erect, alter and dismantle scaffolding basic level
- CPCCSF2004 (has a prerequisite)Place and fix reinforcement materials
- FWPCOT2239Trim and cut felled trees
- FWPFGM3212Fall trees manually (intermediate)
- RIICBS202EHand spread asphalt
- RIICBS203ESafely handle bituminous materials
- RIICBS301EConduct profile planer operations
- RIICCM209ECarry out concrete work
- RIICCM210EInstall trench support
- RIICCM211EConstruct and dismantle fences and gates
- RIICPL302EInstall stormwater systems
- RIICPL304EInstall pre-cast gully pits
- RIICPL305EInstall pre-cast access chambers
- RIICRC202EInstall signs
- RIICRC203EInstall sub-soil drainage
- RIICRC204EInstall and maintain roadside fixtures
- RIICRC205EInstall utility poles
- RIICRC206EInstall pre-cast concrete crash barriers
- RIICRC207EInstall noise barriers
- RIICRC208ELay pipes
- RIICRC209ELay reinforced concrete box culverts
- RIIHAN201EOperate a forklift
- RIIHAN208EPerform dogging
- RIIHAN211DConduct basic scaffolding operations
- RIIHAN301EOperate elevating work platform
- RIIHAN307EOperate a vehicle loading crane
- RIIIMG301EMaintain site records
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIISAM205ECut, weld and bend materials
- RIIWHS202EEnter and work in confined spaces
- RIIWHS204EWork safely at heights
- RIIWHS205EControl traffic with stop-slow bat
- RIIWMG301EControl construction site water tables
- TLID3011Conduct specialised forklift operations
- TLILIC0003Licence to operate a forklift truck
Group M Road Marking (Specialisation Core)
- RIICRM202EHandle and store road marking materials
- RIICRM204EPrepare surfaces for road marking
- RIIIMG301EMaintain site records
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
Group N Road Marking (Technical)
- RIICRM301EConduct ride on road marking operations
- RIICRM302EConduct long line road marking operations
- RIICRM303EConduct thermo plastic road marking operations
Group O Road Marking (General)
- BSBTWK301Use inclusive work practices
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- CPCCLSF2001ALicence to erect, alter and dismantle scaffolding basic level
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM208ECarry out basic levelling
- RIICCM209ECarry out concrete work
- RIICRC202EInstall signs
- RIICRM201FEscort mobile works
- RIICRM203EConduct pedestrian road marking operations
- RIICRM205EConduct road marking measuring operations
- RIICRM206EConduct airless and atomised spraying operations
- RIICRM207EInstall raised pavement markers
- RIIHAN201EOperate a forklift
- RIIHAN208EPerform dogging
- RIIHAN301EOperate elevating work platform
- RIIHAN307EOperate a vehicle loading crane
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIISAM205ECut, weld and bend materials
- RIIWHS204EWork safely at heights
- RIIWHS205EControl traffic with stop-slow bat
- RIIWHS302EImplement traffic management plans
- TLILIC0003Licence to operate a forklift truck
Group P Tunnel Construction (Specialisation Core)
- RIICCM202EIdentify, locate and protect underground services
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM207ESpread and compact materials manually
- RIICCM208ECarry out basic levelling
- RIICRC203EInstall sub-soil drainage
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
- RIIWMG203EDrain and dewater civil construction sites
Group Q Tunnel Construction (Technical)
- RIIBLA303EConduct underground development shotfiring
- RIICCM211EConstruct and dismantle fences and gates
- RIICFW302EInstall temporary and permanent rock anchors
- RIICFW303EInstall primary ground supports
- RIICRC301EMaintain drainage systems
- RIICTC301EInstall tunnelling constructions services
- RIICTC302ELine tunnels
- RIICTC303EExcavate tunnel by machine
- RIICTC304EMuck out tunnel earthworks
- RIICTC305EConstruct portals
- RIICTC306Conduct tunnel boring machine operations
- RIIHAN301EOperate elevating work platform
- RIIUND310EApply shotcrete underground
Group R Tunnel Construction (General)
- BSBTWK301Use inclusive work practices
- CPCCCM2007 (has a prerequisite)Use explosive power tools
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- CPCCLSF2001ALicence to erect, alter and dismantle scaffolding basic level
- CPCCWHS2001Apply WHS requirements, policies and procedures in the construction industry
- RIIBLA202FSupport underground shotfiring operations
- RIIBLA205EStore, handle and transport explosives
- RIICCM209ECarry out concrete work
- RIICCM210EInstall trench support
- RIICCM211EConstruct and dismantle fences and gates
- RIICRC201ERepair potholes
- RIICRC208ELay pipes
- RIIHAN208EPerform dogging
- RIIHAN211DConduct basic scaffolding operations
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIISAM205ECut, weld and bend materials
- RIIWHS202EEnter and work in confined spaces
- RIIWHS204EWork safely at heights
- RIIWHS205EControl traffic with stop-slow bat
- RIIWHS302EImplement traffic management plans
- TLILIC0003Licence to operate a forklift truck
Group S Timber Bridge Construction and Maintenance (Specialisation Core)
- RIICCM202EIdentify, locate and protect underground services
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM210EInstall trench support
- RIICTB201EMaintain timber bridges
- RIICTB301EUndertake visual inspections
- RIICTB302EInstall temporary support members
- RIICTB304EInstall or replace sub-structure members
- RIICTB305EInstall or replace super-structure members
- RIICTB306ESplice and connect timber members
- RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
- RIIWHS204EWork safely at heights
Group T Timber Bridge Construction and Maintenance (Technical)
- RIICBM304EOperate bridge inspection units
- RIICBM307EConstruct formwork and false work on concrete bridges
- RIICCM211EConstruct and dismantle fences and gates
- RIICFW304EConduct pile driving operations
- RIICFW306EDirect pile driving operations
- RIICTB303EErect temporary modular support systems (baileys) on existing bridges
- RIICTB307EAssemble and disassemble temporary modular bridges
- RIICTB308EInstall or replace truss members
- RIICTB309EConstruct, maintain and remove coffer dams
- RIICTB310EConstruct specialised timber deck systems
- RIIHAN302DConduct intermediate scaffolding operations
- RIIWHS302EImplement traffic management plans
Group U Timber Bridge Construction and Maintenance (General)
- BSBTWK301Use inclusive work practices
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- CPCCLSF2001ALicence to erect, alter and dismantle scaffolding basic level
- FWPCOT2239Trim and cut felled trees
- RIICCM207ESpread and compact materials manually
- RIICCM208ECarry out basic levelling
- RIICCM209ECarry out concrete work
- RIICTB202EApply bridge durability treatments
- RIICTB203EProduce bridge drawings and sketches
- RIIHAN208EPerform dogging
- RIIHAN211DConduct basic scaffolding operations
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIISAM205ECut, weld and bend materials
- RIIWHS202EEnter and work in confined spaces
- RIIWHS205EControl traffic with stop-slow bat
- RIIWMG203EDrain and dewater civil construction sites
- TLILIC0003Licence to operate a forklift truck
Group V Traffic Management (Specialisation Core)
- FBPOPR1010Carry out manual handling tasks
- RIIRIS201EConduct local risk control
- RIIRTM203EWork as a safety observer/spotter
- RIISTD201ERead and interpret maps
- RIIVEH201EOperate a light vehicle
- RIIWHS205EControl traffic with stop-slow bat
- RIIWHS302EImplement traffic management plans
- TLIE3004Prepare workplace documents
Group W Traffic Management (Technical)
- RIICRM201FEscort mobile works
- RIICWD503EPrepare traffic management plans and traffic guidance schemes
- RIIRTM201EPosition, set-up and operate variable message signs
- RIIRTM202EPosition, set-up and operate portable traffic signals
- RIIRTM301EOperate truck or trailer mounted attenuators
- RIIWHS206Control traffic with portable traffic control devices and temporary traffic signs
- RIIWHS303Position, set up and program portable traffic control devices
- RIIWHS304 (has a prerequisite)Implement traffic management plans on high volume roads
- RIIWHS305 (has a prerequisite)Implement traffic management plans on motorways and freeways
Group X Traffic Management (General)
- BSBSUS211Participate in sustainable work practices
- BSBTWK301Use inclusive work practices
- HLTAID011Provide First Aid
- RIIBEF202EIdentify and rectify site operating problems
- RIIBEF301DRun on-site operations
- RIIBEF402DSupervise on-site operations
- RIICCM206ESupport plant operations
- RIICRC202EInstall signs
- RIICRC206EInstall pre-cast concrete crash barriers
- RIIGOV201EComply with site work processes/procedures
- RIIGOV401EApply, monitor and report on compliance systems
- RIIHAN201EOperate a forklift
- RIIQUA201EMaintain and monitor site quality standards
- RIIRIS402ECarry out the risk management process
- TAEDEL301Provide work skill instruction
- TLIE2007Use communications systems
- TLIL1001Complete workplace orientation/induction procedures
Group YA General – Asphalt Surfacing
- RIICBS202EHand spread asphalt
- RIICBS207ETake samples of road surfacing materials
- RIICBS301EConduct profile planer operations
- RIICBS302EConduct paver screeding operations
- RIICBS304ECompact asphalt with rollers
- RIICBS305EConduct asphalt paver operation
- RIICBS310EConduct patching operations
- RIICBS311EProduce asphalt products
- RIICBS317Conduct road maintenance operations
- RIICBS203ESafely handle bituminous materials
Group YB General – Spray Sealing
- RIICBS203ESafely handle bituminous materials
- RIICBS303EConduct materials transfer vehicle operations
- RIICBS306EConduct micro surfacing operations
- RIICBS307EConduct bitumen sprayer operations
- RIICBS308ELoad aggregate using purpose built loaders
- RIICBS309EConduct self-propelled aggregate spreader operations
- RIICBS312EConduct bitumen tanker operations
- RIICBS313Conduct tack coat spraying operations
- RIICBS314Conduct aggregate spreader box operations
- RIICBS315Roll aggregate in sprayed sealing operations
- RIICBS316Conduct pavement sweeping operations
Group YC General – Concrete Bridge Construction
- RIICBM201EStrip pile heads
- RIICBM301EMaintain concrete bridges
- RIICBM302E (has a prerequisite)Install pre-cast girders
- RIICBM303EInstall pre-cast parapets
- RIICBM304EOperate bridge inspection units
- RIICBM305E (has a prerequisite)Install pre-cast concrete bridge decks
- RIICBM306EUndertake concreting work on concrete bridges
- RIICBM307EConstruct formwork and false work on concrete bridges
Group YD General – Foundations
- RIICFW301EConstruct underpinning
- RIICFW302EInstall temporary and permanent rock anchors
- RIICFW303EInstall primary ground supports
- RIICFW304EConduct pile driving operations
- RIICFW305EConduct cast in-situ pilings operations
- RIICFW306EDirect pile driving operations
- RIICFW307EDirect cast in-situ piling operations
- RIICFW308Conduct screw piling operations
Group YE General – Pipe Laying
- RIICPL301EInstall water mains pipelines
- RIICPL302EInstall stormwater systems
- RIICPL303EInstall sewer pipelines
- RIICPL304EInstall pre-cast gully pits
- RIICPL305EInstall pre-cast access chambers
- RIICRC208ELay pipes
- RIICRC209ELay reinforced concrete box culverts
- RIICRC301EMaintain drainage systems
Group YF General – Road Marking
- RIICRM201FEscort mobile works
- RIICRM202EHandle and store road marking materials
- RIICRM203EConduct pedestrian road marking operations
- RIICRM204EPrepare surfaces for road marking
- RIICRM205EConduct road marking measuring operations
- RIICRM206EConduct airless and atomised spraying operations
- RIICRM207EInstall raised pavement markers
- RIICRM301EConduct ride on road marking operations
- RIICRM302EConduct long line road marking operations
- RIICRM303EConduct thermo plastic road marking operations
Group YG General – Timber Bridge Construction
- RIICTB201EMaintain timber bridges
- RIICTB202EApply bridge durability treatments
- RIICTB203EProduce bridge drawings and sketches
- RIICTB301EUndertake visual inspections
- RIICTB302EInstall temporary support members
- RIICTB303EErect temporary modular support systems (baileys) on existing bridges
- RIICTB304EInstall or replace sub-structure members
- RIICTB305EInstall or replace super-structure members
- RIICTB306ESplice and connect timber members
- RIICTB307EAssemble and disassemble temporary modular bridges
- RIICTB308EInstall or replace truss members
- RIICTB309EConstruct, maintain and remove coffer dams
- RIICTB310EConstruct specialised timber deck systems
Group YH General – Trenchless Technology
- RIICTT301EConduct fluid assisted directional boring
- RIICTT302EConduct impact moling, ramming and augering operations
- RIICTT303EControl micro tunnelling and pipe-jacking operations
- RIICTT304EUndertake on-line replacement for existing pipeline systems
- RIICTT305EUndertake localised repair and sealing of existing pipeline systems
- RIICTT306EInstall cure in-place linings for existing pipeline systems
- RIICTT307ESpray linings for existing pipeline systems
- RIICTT308EInstall close-fit linings for existing pipeline systems
- RIICTT309EInstall slip lining in existing pipeline systems
- RIICTT310ERenovate large diameter pipes and chambers
- RIIOGF302EOperate drilling fluids and mud pits
- RIIOGN303EOperate, monitor and maintain mud systems
Group YI General – Tunnelling
- RIICTC301EInstall tunnelling constructions services
- RIICTC302ELine tunnels
- RIICTC303EExcavate tunnel by machine
- RIICTC304EMuck out tunnel earthworks
- RIICTC305EConstruct portals
- RIICTC306Conduct tunnel boring machine operations
Group YJ General – Traffic Management
- RIIBEF301DRun on-site operations
- RIICWD503EPrepare traffic management plans and traffic guidance schemes
- RIIRIS402ECarry out the risk management process
- RIIRTM201EPosition, set-up and operate variable message signs
- RIIRTM202EPosition, set-up and operate portable traffic signals
- RIIRTM301EOperate truck or trailer mounted attenuators
- RIIWHS206Control traffic with portable traffic control devices and temporary traffic signs
- RIIWHS303Position, set up and program portable traffic control devices
- RIIWHS304 (has a prerequisite)Implement traffic management plans on high volume roads
- RIIWHS305 (has a prerequisite)Implement traffic management plans on motorways and freeways
Group YK General – Utilities
- ICTCBL334Install underground enclosures and conduit
- PMBWELD301Butt weld polyethylene plastic pipelines
- PMBWELD302Electrofusion weld polyethylene pipelines
- RIICCM202EIdentify, locate and protect underground services
- RIICPL301EInstall water mains pipelines
- RIICPL303EInstall sewer pipelines
- RIICRC203EInstall sub-soil drainage
- RIIHAN308FLoad and unload plant
- RIIMPO320FConduct civil construction excavator operations
- RIIWMG203EDrain and dewater civil construction sites
Group Z General – General and Other Units
- BSBOPS304Deliver and monitor a service to customers
- BSBOPS402Coordinate business operational plans
- BSBTWK301Use inclusive work practices
- BSBXTW301Work in a team
- CPCCCM2007 (has a prerequisite)Use explosive power tools
- CPCCLDG3001ALicence to perform dogging
- CPCCLRG3001A (has a prerequisite)Licence to perform rigging basic level
- CPCCLSF2001ALicence to erect, alter and dismantle scaffolding basic level
- CPCCSF2004 (has a prerequisite)Place and fix reinforcement materials
- FWPCOT2239Trim and cut felled trees
- FWPFGM3212Fall trees manually (intermediate)
- RIIBLA201ESupport shotfiring operations
- RIIBLA202FSupport underground shotfiring operations
- RIIBLA205EStore, handle and transport explosives
- RIIBLA301EConduct surface shotfiring operations
- RIIBLA303EConduct underground development shotfiring
- RIICCM202EIdentify, locate and protect underground services
- RIICCM205FCarry out manual excavation
- RIICCM206ESupport plant operations
- RIICCM207ESpread and compact materials manually
- RIICCM208ECarry out basic levelling
- RIICCM209ECarry out concrete work
- RIICCM210EInstall trench support
- RIICCM211EConstruct and dismantle fences and gates
- RIICRC201ERepair potholes
- RIICRC202EInstall signs
- RIICRC203EInstall sub-soil drainage
- RIICRC204EInstall and maintain roadside fixtures
- RIICRC205EInstall utility poles
- RIICRC206EInstall pre-cast concrete crash barriers
- RIICRC207EInstall noise barriers
- RIICRC302EPlace and form concrete kerb, channel and fixtures
- RIICRC303ELay pavers
- RIICRC304EMaintain sealed roads
- RIICRC305EConduct road construction paver screeding operations
- RIICRC306EConduct earthworks
- RIICRC307EConduct road pavement construction
- RIIHAN201EOperate a forklift
- RIIHAN208EPerform dogging
- RIIHAN211DConduct basic scaffolding operations
- RIIHAN301EOperate elevating work platform
- RIIHAN307EOperate a vehicle loading crane
- RIIHAN308FLoad and unload plant
- RIIHAN309FConduct telescopic materials handler operations
- RIIIMG301EMaintain site records
- RIIMPO318FConduct civil construction skid steer loader operations
- RIIMPO334EConduct skid steer loader operations using attachments
- RIIMPO339AConduct side tipper operations
- RIIRIS201EConduct local risk control
- RIIRIS202ERespond to site based spills
- RIIRTM203EWork as a safety observer/spotter
- RIISAM205ECut, weld and bend materials
- RIIWHS202EEnter and work in confined spaces
- RIIWHS204EWork safely at heights
- RIIWHS205EControl traffic with stop-slow bat
- RIIWHS302EImplement traffic management plans
- RIIWMG203EDrain and dewater civil construction sites
- RIIWMG301EControl construction site water tables
- TLID3011Conduct specialised forklift operations
- TLILIC0003Licence to operate a forklift truck
- RIICBM302E (has a prerequisite)Install pre-cast girders
- RIICBM305E (has a prerequisite)Install pre-cast concrete bridge
- RIIWHS304 (has a prerequisite)Implement traffic management
- RIIWHS305 (has a prerequisite)Implement traffic management
This unit has a prerequisite unit. Check the unit on training.gov.au for details.
PREREQUISITES
- CPCCCM2007 Use explosive power tools — prerequisite: CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry
- CPCCLRG3001A Licence to perform rigging – — prerequisite: CPCCLDG3001A Licence to perform dogging PREREQUISITE UNITS
- CPCCSF2004 Place and fix reinforcement — prerequisite: CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry
- RIICBM302E Install pre-cast girders — prerequisite: CPCCLDG3001A Licence to Perform Dogging
- RIICBM305E Install pre-cast concrete bridge — prerequisite: CPCCLDG3001A Licence to Perform Dogging
- RIIWHS304 Implement traffic management — prerequisite: RIIWHS302E Implement traffic management plans
- RIIWHS305 Implement traffic management — prerequisite: RIIWHS302E Implement traffic management plans
EVIDENCE YOU'LL NEED
- Resume showing your work history
- Reference letters from employers
- Photos or videos of jobs you've done
- Payslips or employment contracts
LICENSING
Licensing, legislative, regulatory or certification considerations Licensing, legislative and certification requirements that apply to this qualification can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the qualification.
View on training.gov.au(opens in a new tab)